
Entry speed reduction sign RS 286 KL3. Text: 4 (2)
Product Information
| Characteristics | Testmethode | ||
|---|---|---|---|
| SPC | SPC60400-1 bijlage 8.21 | ||
| Foil | KL3 | ||
| Breedte in mm | 900 | ||
| Height in mm | 900 | ||
| Sign color | RAL9017 | ||
| Carrier | C2C | ||
Product description
Entry Speed Reduction Sign RS 286 KL3. Text: 4 (2)
The Entry speed reduction sign RS 286 KL3. Text: 4 (2) is an essential component in railway infrastructure, specifically designed to inform train operators of upcoming speed restrictions. This sign plays a crucial role in enhancing safety by ensuring that trains reduce their speed appropriately when approaching areas of potential risk or complexity on the track. It is particularly useful in zones where transitions occur, such as junctions or areas undergoing maintenance, allowing for smoother operations and improved safety standards within railway systems.
Functionality and Applications of RS 286 KL3 Signage
The primary function of the Entry speed reduction sign RS 286 KL3. Text: 4 (2) is to facilitate effective communication of speed limits to train drivers. Its strategic placement in railway environments alerts operators ahead of key changes, thereby promoting compliance with regulatory requirements and enhancing the overall safety culture within the rail sector. Common applications include areas near passenger stations, freight yards, and sections of track undergoing modifications, where reduced speed is critical for both personnel safety and operational efficiency.
Durability and Visibility for Railway Environments
Designed with durability in mind, the Entry speed reduction sign RS 286 KL3. Text: 4 (2) is built to withstand the rigors of outdoor railway environments. With weather-resistant materials and high-visibility reflective surfaces, this sign ensures legibility in various lighting and weather conditions, thus maintaining a high standard of safety at all times. The engineering behind this sign guarantees long-term performance, making it a reliable choice for infrastructure projects in the rail and energy sectors across the Benelux region.
Request Quotation
Request a direct quotation of this product. Within 2 business days you will receive an extensive quote put together by one of our experts!

















