parallax background image

Entry speed reduction sign RS 286 KL3. Text: 5 (2)

Entry speed reduction sign RS 286 KL3. Text: 5 (2)

Product Information

Characteristics Testmethode
SPC SPC60400-1 bijlage 8.21
Foil KL3
Breedte in mm 900
Height in mm 900
Sign color RAL9017
Carrier C2C

Product description

Introducing the Entry Speed Reduction Sign RS 286 KL3. Text: 5 (2)

The Entry speed reduction sign RS 286 KL3. Text: 5 (2) is a critical component in the safety and efficiency of railway infrastructure. This sign serves an essential function by advising train operators of reduced speed limits as they approach specific areas within the rail network. Its primary role is to enhance safety measures by ensuring that locomotives and their crews are alerted to potential hazards or changes in track conditions ahead, thereby minimizing the risk of accidents and improving overall operational efficiency in high-traffic scenarios.

Applications and Visibility of the Entry Speed Reduction Sign RS 286 KL3. Text: 5 (2)

This railway sign is designed for use in various applications, including at junctions, merging tracks, and areas prone to unexpected changes in alignment. Constructed to the highest visibility standards, the Entry speed reduction sign RS 286 KL3. Text: 5 (2) is equipped with reflective materials that ensure clear readability in low-light conditions. This enhanced visibility is crucial for maintaining safe operational practices as it allows train operators to react appropriately to speed limits under varying weather conditions, day or night.

Durability and Outdoor Suitability

Built with resilience in mind, the Entry speed reduction sign RS 286 KL3. Text: 5 (2) is specifically designed to withstand the rigors of outdoor railway environments. Constructed from high-quality materials, it demonstrates excellent resistance to weathering, UV exposure, and impacts, ensuring longevity even in the most challenging conditions. This durability allows railway operators to maintain a dependable and safe signaling system, crucial for the integrity of rail operations across the Benelux region.

Request Quotation

Request a direct quotation of this product. Within 2 business days you will receive an extensive quote put together by one of our experts!

Our certifications
ManagementsysteemCertificatie.ISO9001.png
View all certifications ›
Subscribe to Our Newsletter

Sign up for the free newsletter to stay up to date