parallax background image

Entry speed reduction sign RS 286 KL3. Text: 6 (2)

Entry speed reduction sign RS 286 KL3. Text: 6 (2)

Product Information

Characteristics Testmethode
SPC SPC60400-1 bijlage 8.21
Foil KL3
Breedte in mm 900
Height in mm 900
Sign color RAL9017
Carrier C2C

Product description

Entry Speed Reduction Sign RS 286 KL3. Text: 6 (2)

The Entry speed reduction sign RS 286 KL3. Text: 6 (2) plays a crucial role in railway infrastructure by ensuring safe and efficient train operations as vehicles approach speed-restricted sections of the rail network. This sign is designed to alert train drivers to reduce their speed to enhance safety for both the passengers and the surrounding environment. Typically positioned at critical points, the RS 286 KL3 sign serves as a vital communication tool between the railway's operational protocols and the train crews, ultimately maintaining flow and order in rail operations.

Visibility and Safety Role

The Entry speed reduction sign RS 286 KL3. Text: 6 (2) is constructed with high-visibility materials, ensuring that it can be seen clearly from a distance, even under diverse weather conditions. This sign adheres to strict railway safety regulations, providing train operators with clear instructions to reduce speed, thereby reducing the risk of incidents at critical junctions or curves. Its effective design not only forms an integral part of the train control system but also enhances overall safety by facilitating timely responses from train drivers.

Durability and Outdoor Suitability

Engineered for outdoor railway environments, the Entry speed reduction sign RS 286 KL3. Text: 6 (2) is built to withstand harsh weather conditions, including heavy rain and extreme temperatures. Its durable materials ensure longevity and resilience, minimizing the need for frequent replacements or maintenance. This sign is ideal for installation alongside tracks, contributing to the robustness and reliability of railway operations across the Benelux region, thus supporting the ongoing commitment of infrastructure managers to safety and efficiency in rail transport.

Request Quotation

Request a direct quotation of this product. Within 2 business days you will receive an extensive quote put together by one of our experts!

Our certifications
ManagementsysteemCertificatie.ISO9001.png
View all certifications ›
Subscribe to Our Newsletter

Sign up for the free newsletter to stay up to date