parallax background image

Speed reduction sign RS 313 DOR KL3. Text: 11 (2)

Speed reduction sign RS 313 DOR KL3. Text: 11 (2)

Product Information

Characteristics Testmethode
SPC SPC60400-1 bijlage 8.54
Foil KL3
Breedte in mm 700
Height in mm 700
Sign color RAL9017
Carrier C2C

Product description

Speed Reduction Sign RS 313 DOR KL3. Text: 11 (2)

The Speed reduction sign RS 313 DOR KL3. Text: 11 (2) is a critical component in ensuring the safety and efficiency of railway operations. Designed specifically for use in the rail infrastructure sector, this sign serves to inform train operators of necessary speed reductions in specific areas where track conditions or other variables necessitate caution. Its clear, universally recognized design helps maintain safe travel speeds, reducing the risk of accidents and enhancing overall operational safety.

Durability and Visibility of the Speed Reduction Sign RS 313 DOR KL3. Text: 11 (2)

Constructed with high-quality materials, the Speed reduction sign RS 313 DOR KL3. Text: 11 (2) is built to withstand harsh outdoor railway environments. Its durability guarantees longevity while ensuring continuous compliance with industry standards. The sign features high-visibility colors and reflective properties, making it easily identifiable under various lighting conditions, including low visibility scenarios. This ensures that train operators can quickly recognize and respond to the speed restrictions indicated, thereby enhancing overall safety on the rail network.

Applications and Integration in Railway Infrastructure

The Speed reduction sign RS 313 DOR KL3. Text: 11 (2) is typically deployed in areas such as locations with tight curves, track work zones, or regions prone to environmental challenges. Its strategic placement contributes to better management of train traffic and minimizes the risk of derailments or other safety incidents. By integrating this sign into the railway signaling system, operators can ensure that all personnel and train crews are well-informed, leading to smoother and more efficient operations throughout the railway infrastructure.

Request Quotation

Request a direct quotation of this product. Within 2 business days you will receive an extensive quote put together by one of our experts!

Our certifications
ManagementsysteemCertificatie.ISO9001.png
View all certifications ›
Subscribe to Our Newsletter

Sign up for the free newsletter to stay up to date