
Speed reduction sign RS 313 DOR KL3. Text: 6 (2)
Product Information
| Characteristics | Testmethode | ||
|---|---|---|---|
| SPC | SPC60400-1 bijlage 8.54 | ||
| Foil | KL3 | ||
| Breedte in mm | 700 | ||
| Height in mm | 700 | ||
| Sign color | RAL9017 | ||
| Carrier | C2C | ||
Product description
Introducing the Speed Reduction Sign RS 313 DOR KL3. Text: 6 (2)
The Speed reduction sign RS 313 DOR KL3. Text: 6 (2) is a crucial element in railway infrastructure, designed to ensure the safety and efficiency of rail operations. This sign plays a vital role in regulating the speed of trains approaching certain areas, effectively reducing the risk of accidents and enhancing safety for both passengers and railway personnel. Its clear and distinct graphics communicate vital information, prompting timely actions by train operators to maintain safe speeds in designated zones.
Applications and Visibility of the Speed Reduction Sign RS 313 DOR KL3. Text: 6 (2)
Commonly used at strategic locations, the Speed reduction sign RS 313 DOR KL3. Text: 6 (2) is essential in areas with speed restrictions due to track conditions, construction, or proximity to high-traffic stations. Engineered for high visibility, this sign is manufactured to withstand various weather conditions typical in outdoor railway environments. Its color scheme and design adhere to industry standards, ensuring that it can be easily recognized from a distance, even in low-light conditions. This visibility is paramount in maintaining safety and operational integrity across the railway network.
Durability and Suitability for Outdoor Use
Constructed with high-quality materials, the Speed reduction sign RS 313 DOR KL3. Text: 6 (2) is designed for durability and longevity. It is specifically engineered to resist adverse weather elements, including rain, snow, and UV exposure, making it suitable for long-term outdoor use in the rigorous environment of rail infrastructure. Rhevolec's extensive experience ensures that this sign meets the highest standards of quality and performance, contributing to safe and reliable railway operations across the Benelux region.
Request Quotation
Request a direct quotation of this product. Within 2 business days you will receive an extensive quote put together by one of our experts!

















